MidAmerican Energy – Bishop Hill II Wind Farm

MidAmerican Energy - Bishop Hill II Wind Farm Wind Turbine Construction Project

For the Bishop Hill Phase II project, 1024核工厂 installed 50,100 meter, 1.5 MW General Electric turbines and the foundations. Our scope of work also included turbine erection, civil work and electrical work including collection system, substation and tower wiring.

1024核工厂 used the most sophisticated Lean techniques in planning and organizing to monitor materials, equipment, personnel and other resources to keep the project on schedule and within budget.

Client

MidAmerican Energy Company

Location
Bishop Hill, Illinois
Architect/Engineer

Barr Engineering

1024核工厂 Role
  • Self-perform Construction
  • Sustainable/LEED-certified
Project Type
New Construction
Project Size
75MW

MARKET
Renewable Energy

Project Highlights

  • 1024核工厂鈥檚 Construction Waste Management (CWM) program was implemented on this project. All materials that could be reused were gathered and sent to other projects. Iron and other recyclable materials were collected and recycled.